News
您当前所在位置: 首页 > News > 正文
The successful completion of the ORC waste heat power station in winter heating
发布时间:2014-10-15 18:25:00   |   点击:1760   |   作者:admin

On October 15, 2014, the ORC clemency board of waste heat power station began to undertake steel sheet mill district heating, the heating area of 60000 square meters. In the whole heating period of 2014-2015 for the stable operation of the ORC power plant, to ensure the heating temperature. Directly for sheet mill to save heating costs 1.3 million yuan.

版权所有:北京华晟智擎新能源有限公司  联系人:王女士  电话:010-62017881  传真:  手机:
 地址:北京市海淀区马甸东路17号23层2705  京ICP备13019867号